Solar Installation in Kenya

Home >> Blog >> Solar >> Solar Installation in Kenya

SOLAR INSTALLATION IN KENYA

Enjoy Reduced Electricity Bill Uninterruted Power Supply

Seamless Process Automation Limited is one of the leading contractor for solar installation in Kenya with over 10 years’ experience delivering projects in residential, commercial and industrial sectors.

Certification and Warranty

Our team comprise of engineers and technicians fully approved by Energy and Petroleum Regulatory Authority (EPRA) to carry our solar installations for off-grid, hybrid and grid-connected systems.

We offer 10 years warranty on solar PV panels and 2 years warranty on our installations.

We supply solar products from leading manufacturers such as

Solar Installation Process

Enquiry

We receive customer requests through telephone messages, calls or emails. Our technical sales team engages the customer to understand the requirement including their energy usage patterns, Kenya Power & Lighting Company (KPLC) bills and available space where solar panels can be installed.

Survey

Sometimes we offer to visit our customers site to discuss project design and installation. We assess roof space and mechanical integrity to hold solar PV panels, inverters and cable runs

Technical and Commercial Proposal

Once all the technical details are collected, our tendering team prepares formal quotation and shared with the customer for approval / negotiations.

Planning and Permits

In Kenya, it is required to have City Council permit for solar panel installation to ensure safety and professional compliance.

We seek this permit soon as we formally receive formal order from the customer.

Mobilization of Tools and Resources

Our technical team will conduct pre-installation survey to identify access equipment and scaffolding that will be required during installation. This survey also includes kick-off meeting with the customer to align on the installation process and timeline.

Installation

All products and tools are delivered to site 2-3 days before the scheduled date of commencing installation.

During the entire installation period, our project manager keeps track of progress and update the customer on a regular basis.

Commissioning and Start-up

Upon completion, our team will conduct operation and maintenance training to the customer. The customer will be issued with login details for online system monitoring.

All structural and electrical drawing will be provided both soft copy and hard copies.

Post-Installation Support

Any issue that occurs with the system during the warranty period is resolved promptly over the phone or site visit.

We recommend signing service maintenance contract to ensure your system efficiency and longevity.

Payback Periof for Solar Installation in Kenya

Payback period from a solar installation varies depending on several variables. Within 3 – 5 years the solar system shall have paid itself; this is quite impressive because you will expect to use this system for approximately 20 to 30 years.

Some of the factors affecting payback period includes:

  • Size and design of solar arrays (orientation, shading, tilt)
  • Pattern / period of usage
  • Geographical location of the installation (sunlight hours)
  • Cost and quality of the installed solar system
Roof Solar Panels in Kenya

Gallery - Solar Installation in Kenya

Call or Write to us

We assure optimised technical and commercial proposal

Scroll to Top

Talk To Us

Providing trusted electrical automation solutions along with unmatched after-sale support

Open chat
1
Need Support? Lets Talk
Looking for Electrical & Automation products? Lets Talk
Skip to content